Supply and install relay control panel (2 control panel, 2 protection panel) pada Loyang Substation Singapore.

Fasilitas kelistrikan sebagai konteks pengalaman proyek PT GUT.

Ringkasan proyek

Project register mencatat supply and install relay control panel (2 ea control panel, 2 ea protection panel) pada Loyang Substation Singapore, dengan end-user Loyang Power Singapore, dipesan melalui Siemens Energy Singapore.

Scope pekerjaan

Supply and install relay control panel (2 ea control panel, 2 ea protection panel).